Quick Answer: Yes — building an ADU and adding solar panels at the same time in San Jose is not only possible but financially smart. California Title 24 (Section 150.2(b))

">
Search
Close this search box

Can You Build an ADU and Add Solar Panels at the Same Time in San Jose 2025?

Categories:
Table of Contents

Quick Answer: Yes — building an ADU and adding solar panels at the same time in San Jose is not only possible but financially smart. California Title 24 (Section 150.2(b)) requires that all new ADUs include a solar-ready roof and electrical infrastructure (conduit, panel space) even if solar isn’t installed immediately. Since you’re already doing this electrical work for the ADU, adding actual solar panels at the same time saves you the cost of a mobilization fee (typically $2,000-$4,000 for a solar installer to return later). The solar system should be sized to cover BOTH the main house and the new ADU’s electricity needs — an ADU typically uses 3,000-5,000 kWh per year, adding roughly 1.5-2.5 kW of solar capacity needed.

ADU + Solar Combination Guide — San Jose 2025

  • Title 24 ADU solar-ready requirement: All new ADUs in California require a solar-ready electrical system — this means a 200-amp panel (or sub-panel), conduit from panel to roof, and a reserved circuit breaker slot. This work is required regardless of whether you install solar, so installing solar at the same time costs only incremental materials, not a second mobilization
  • Sizing the solar system for ADU + main house: Estimate 3,000-5,000 kWh/year for a 400-800 sq ft ADU (depending on HVAC type and tenant habits). Add this to your main house consumption. A combined 10-14 kW system (28-38 panels) typically covers both units in San Jose’s climate
  • Battery storage with ADU solar: Under California’s NEM 3.0 metering, solar export credits are low (about $0.05/kWh compared to retail $0.30+/kWh). A battery (Tesla Powerwall or Enphase IQ) allows you to store ADU daytime generation for main house nighttime use — maximizing self-consumption and payback. A combined ADU + battery + solar system pays back in 8-12 years under NEM 3.0
  • Separate meter for ADU: San Jose allows ADU tenants to have their own PG&E meter (ADU sub-meter) — this makes billing simple and the tenant pays their own electricity. In this case, size solar for the main house only; the ADU solar system would need to be on the ADU’s meter separately
  • Permit coordination: A solar permit (City of San Jose electrical permit) and ADU building permit can be submitted together or sequentially. Coordinate with your solar installer to submit the solar permit before or concurrent with the ADU permit to avoid delays
System ConfigurationSystem SizeCost Before ITCCost After 30% ITC
Main house only (no ADU)6-8 kW$18,000 – $24,000$12,600 – $16,800
Main house + ADU (shared meter)9-14 kW$27,000 – $42,000$18,900 – $29,400
Main house + ADU + 2 Powerwall batteries9-14 kW + 2 batteries$47,000 – $74,000$32,900 – $51,800

Quartz Construction builds ADUs and coordinates solar installations throughout San Jose. Learn about ADU construction services. CSLB #1003436 | Call (650) 749-7436.

Watch: San Jose Remodeling Projects by Quartz Construction


Watch: Bay Area Remodeling Insights

Expert tips and real project walkthroughs to help you plan your Bay Area home improvement.

What Our Bay Area Clients Say

4.9 ★ average rating across Google, Yelp, and Houzz from 150+ Bay Area homeowners.

★★★★★

"Quartz Construction did an amazing job on our kitchen remodel. The team was professional, on time, and the results exceeded our expectations. Highly recommend to any Bay Area homeowner!"

— Michael T.  | 

★★★★★

"We hired them for a bathroom remodel in our San Jose home. From permitting to final walkthrough, everything was handled perfectly. The tile work is stunning. 5 stars without hesitation."

— Sarah L.  | 

★★★★★

"Just finished our ADU garage conversion. The project came in on budget and on schedule — rare in the Bay Area! The rental income already started. Could not be happier with Quartz Construction."

— David R.  | 

Read all reviews on Google →


Follow Us

See our latest projects, client photos, and Bay Area remodeling tips:

Get a Free Estimate

Licensed Bay Area contractor — CSLB #1003436 — serving San Jose, Fremont, Oakland, Santa Clara, Sunnyvale and all Bay Area communities.

Call: (650) 749-7436

    Get a Free Estimate from Quartz Construction

    Licensed General Contractor • CSLB Lic#1003436 • Serving San Jose, Santa Clara & Bay Area

      Quartz is a construction and remodeling company serving San Jose and the nearby areas. Our firm offers a wide range of services, including full-home renovations, kitchen remodeling, bathroom renovations, window replacement, deck building and repair, patio construction, and more.


      The reCAPTCHA verification period has expired. Please reload the page.

      Location

      Address: 1777 Hamilton Avenue #1080, San Jose, 95125 California, USA.

      Mon-Sat: 08:00 – 19:00

      © 2025 Quartz Construction and Remodeling, San Jose, California.

      🔑 CSLB License: #1003436 ↗ Verify|🏆 BBB: A+ Accredited ↗|4.9/565+ Google Reviews ↗|📞 (650) 749-7436